Hi everyone,
What are the steps to change an existing append connection?
Let’s say I have added two more columns on the source sheet.
How do I get this to reflect on the appended sheet tab?
Thanks for the advice
Kim I think you need to manually add those two columns to the destination too before you run the append next time because otherwise it would mix up your data.
But only a guess, I have never tried that myself.
Good luck!
James is entirely right here. Marking as best answer, thanks!
Powered by FreeFlarum.(remove this footer)